{"id":3208,"date":"2020-04-21T23:13:12","date_gmt":"2020-04-21T22:13:12","guid":{"rendered":"https:\/\/www.nickzom.org\/blog\/?p=3208"},"modified":"2024-03-31T07:57:55","modified_gmt":"2024-03-31T06:57:55","slug":"how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system","status":"publish","type":"post","link":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/","title":{"rendered":"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"251\" height=\"201\" src=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Pouring-time-for-medium-sized-and-large-casting-up-to1000kg-in-mass.jpeg\" alt=\"\" class=\"wp-image-3221\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The image above represents pouring time for medium-sized and large casting up to 1000kg in mass. To calculate pouring time for medium-sized and large casting up to 1000kg in mass, three essential parameters are needed and these parameters are <strong>Co-efficient used to Account for Wall Thickness (S), Mass of Casting with Gates and Risers (G)<\/strong> and <strong>Thickness of the Casting (\u03b4).<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>The formula to calculate pouring time for medium-sized and large casting up to 1000kg in mass<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">t = S(G\u03b4)<sup>1&nbsp;\/&nbsp;<sub>3<\/sub><\/sup><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">t = Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass<br>S = Co-efficient used to Account for Wall Thickness<br>G = Mass of Casting with Gates and Risers<br>\u03b4 = Thickness of the Casting<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Let&#8217;s solve an example;<br>Find the pouring time for medium-sized and large casting up to 1000kg in mass when the co-efficient used to account for wall thickness is 9, mass of casting with gates and risers is 12 and thickness of the casting is 21.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This implies that;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">S = Co-efficient used to Account for Wall Thickness = 9<br>G = Mass of Casting with Gates and Risers = 12<br>\u03b4 = Thickness of the Casting = 21<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">t = S(G\u03b4)<sup>1&nbsp;\/&nbsp;<sub>3<\/sub><\/sup><br>t = 9 x (12 x 21)<sup>1&nbsp;\/&nbsp;<sub>3<\/sub><\/sup><br>So, t = 9 x (252)<sup>0.33<\/sup><br>t = 9 x 6.31<br>t =&nbsp;<b>56.84<\/b><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Therefore, the&nbsp;<strong>pouring time for medium-sized and large casting up to 1000kg in mass&nbsp;<\/strong>is&nbsp;<strong>56.84 s.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Read more:&nbsp;<a href=\"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-thin-walled-casting-450kg-in-mass-design-of-gating-system\/\">How to Calculate and Solve for Pouring Time for thin-Walled Casting 450kg in Mass | Design of Gating System<\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Calculating the Co-efficient used to Account for Wall Thickness when the Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass, the Mass of Casting with Gates and Risers and the Thickness of the Casting are Given<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">S = <sup>3<\/sup>\u221a(<sup>t<sup>3<\/sup><\/sup> \/ <sub>G\u03b4<\/sub>)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">S = Co-efficient used to Account for Wall Thickness<br>t = Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass<br>G = Mass of Casting with Gates and Risers<br>\u03b4 = Thickness of the Casting<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Let&#8217;s solve an example;<br>Find the co-efficient used to account for wall thickness when the pouring time for medium-sized and large casting up to 1000kg in mass is 30, mass of casting with gates and risers is 18 and the thickness of the casting is 20.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This implies that;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">t = Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass = 30<br>G = Mass of Casting with Gates and Risers = 18<br>\u03b4 = Thickness of the Casting = 20<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">S = <sup>3<\/sup>\u221a(<sup>t<sup>3<\/sup><\/sup> \/ <sub>G\u03b4<\/sub>)<br>S = <sup>3<\/sup>\u221a(<sup>30<sup>3<\/sup><\/sup> \/ <sub>18 x 20<\/sub>)<br>Then, S = <sup>3<\/sup>\u221a(<sup>27000<\/sup> \/ <sub>360<\/sub>)<br>S = <sup>3<\/sup>\u221a(75)<br>S = 4.21<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Therefore, the&nbsp;<strong>co-efficient used to account for wall thickness&nbsp;<\/strong>is&nbsp;<strong>4.21.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Read more:&nbsp;<a href=\"https:\/\/www.nickzom.org\/blog\/2020\/04\/22\/how-to-calculate-and-solve-for-time-of-pouring-design-of-gating-system\/\">How to Calculate and Solve for Time of Pouring | Design of Gating System<\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Calculating the Mass of Casting with Gates and Risers when the Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass, the Co-efficient used to Account for Wall Thickness and the Thickness of the Casting are Given<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">G = <sup>t<sup>3<\/sup><\/sup> \/ <sub>S<sup>3<\/sup>\u03b4<\/sub><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">G = Mass of Casting with Gates and Risers<br>t = Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass<br>S = Co-efficient used to Account for Wall Thickness<br>\u03b4 = Thickness of the Casting<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Let&#8217;s solve an example;<br>Find the mass of casting with gates and risers when the pouring time for medium-sized and large casting up to 1000kg in mass is 16, the co-efficient used to account for wall thickness is 12 and the thickness of the casting is 8.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This implies that;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">t = Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass = 16<br>S = Co-efficient used to Account for Wall Thickness = 12<br>\u03b4 = Thickness of the Casting = 8<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">G = <sup>t<sup>3<\/sup><\/sup> \/ <sub>S<sup>3<\/sup>\u03b4<\/sub><br>G = <sup>16<sup>3<\/sup><\/sup> \/ <sub>12<sup>3<\/sup> x 8<\/sub><br>So, G = <sup>4096<\/sup> \/ <sub>1728 x 8<\/sub><br>G = <sup>4096<\/sup> \/ <sub>13824<\/sub><br>G = 0.296<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Therefore, the&nbsp;<strong>mass of casting with gates and risers&nbsp;<\/strong>is&nbsp;<strong>0.296.<\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Calculating the Thickness of the Casting when the Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass, the Co-efficient used to Account for Wall Thickness and the Mass of Casting with Gates and Risers are Given<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">\u03b4 = <sup>t<sup>3<\/sup><\/sup> \/ <sub>S<sup>3<\/sup> x G<\/sub><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u03b4 = Thickness of the Casting<br>t = Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass<br>S = Co-efficient used to Account for Wall Thickness<br>G = Mass of Casting with Gates and Risers<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Let&#8217;s solve an example;<br>Find the thickness of the casting when the pouring time for medium-sized and large casting up to 1000kg in mass is 10, the co-efficient used to account for wall thickness is 5 and the mass of casting with gates and risers is 14.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This implies that;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">t = Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass = 10<br>S = Co-efficient used to Account for Wall Thickness = 5<br>G = Mass of Casting with Gates and Risers = 14<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u03b4 = <sup>t<sup>3<\/sup><\/sup> \/ <sub>S<sup>3<\/sup> x G<\/sub><br>\u03b4 = <sup>10<sup>3<\/sup><\/sup> \/ <sub>5<sup>3<\/sup> x 14<\/sub><br>Then, \u03b4 = <sup>1000<\/sup> \/ <sub>125 x 14<\/sub><br>\u03b4 = <sup>1000<\/sup> \/ <sub>1750<\/sub><br>\u03b4 = 0.57<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Therefore, the&nbsp;<strong>thickness of the casting&nbsp;<\/strong>is&nbsp;<strong>0.57.<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>How to Calculate Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass With Nickzom Calculator<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Nickzom Calculator \u2013 <strong>The Calculator Encyclopedia<\/strong> is capable of calculating the pouring time for medium-sized and large casting up to 1000kg in mass.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To get the answer and workings of the pouring time for medium-sized and large casting up to 1000kg in mass using the <strong>Nickzom Calculator \u2013 The Calculator Encyclopedia.&nbsp;<\/strong>First, you need to obtain the app.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">You can get this app via any of these means:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Web<\/strong>&nbsp;\u2013&nbsp;<a href=\"https:\/\/www.nickzom.org\/calculator-plus\">https:\/\/www.nickzom.org\/calculator-plus<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To get access to the&nbsp;<strong>professional&nbsp;<\/strong>version via web, you need to&nbsp;<strong>register<\/strong>&nbsp;and&nbsp;<strong>subscribe&nbsp;<\/strong>for<strong>&nbsp;NGN 1,500&nbsp;<\/strong>per<strong>&nbsp;annum<\/strong>&nbsp;to have utter access to all functionalities.<br>You can also try the&nbsp;<strong>demo&nbsp;<\/strong>version via&nbsp;<a href=\"https:\/\/www.nickzom.org\/calculator\">https:\/\/www.nickzom.org\/calculator<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Android (Paid)<\/strong>&nbsp;\u2013&nbsp;<a href=\"https:\/\/play.google.com\/store\/apps\/details?id=org.nickzom.nickzomcalculator\">https:\/\/play.google.com\/store\/apps\/details?id=org.nickzom.nickzomcalculator<\/a><br><strong>Android (Free)<\/strong>&nbsp;\u2013&nbsp;<a href=\"https:\/\/play.google.com\/store\/apps\/details?id=com.nickzom.nickzomcalculator\">https:\/\/play.google.com\/store\/apps\/details?id=com.nickzom.nickzomcalculator<\/a><br><strong>Apple (Paid)<\/strong>&nbsp;\u2013&nbsp;<a href=\"https:\/\/itunes.apple.com\/us\/app\/nickzom-calculator\/id1331162702?mt=8\">https:\/\/itunes.apple.com\/us\/app\/nickzom-calculator\/id1331162702?mt=8<\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Steps to Calculation<\/strong><\/h4>\n\n\n\n<h4 class=\"wp-block-heading\">Once you have obtained the calculator encyclopedia app, proceed to the <strong>Calculator Map,\u00a0<\/strong>then click on\u00a0<strong>Materials &amp; Metallurgical<\/strong><b>\u00a0<\/b>under\u00a0<strong>Engineering.<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"1366\" height=\"768\" src=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1095-2.png\" alt=\"\" class=\"wp-image-3160\" srcset=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1095-2.png 1366w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1095-2-300x169.png 300w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1095-2-1024x576.png 1024w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1095-2-768x432.png 768w\" sizes=\"(max-width: 1366px) 100vw, 1366px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Now, Click on&nbsp;<strong>Foundry Technology<\/strong><strong>&nbsp;u<\/strong>nder&nbsp;<strong>Material &amp; Metallurgical<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"1366\" height=\"768\" src=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1145.png\" alt=\"\" class=\"wp-image-3159\" srcset=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1145.png 1366w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1145-300x169.png 300w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1145-1024x576.png 1024w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1145-768x432.png 768w\" sizes=\"(max-width: 1366px) 100vw, 1366px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Then, Click on <strong>Design of Gating System&nbsp;<\/strong>under&nbsp;<strong>Foundry Technology<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"1366\" height=\"768\" src=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1146.png\" alt=\"\" class=\"wp-image-3158\" srcset=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1146.png 1366w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1146-300x169.png 300w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1146-1024x576.png 1024w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1146-768x432.png 768w\" sizes=\"(max-width: 1366px) 100vw, 1366px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Now, Click on <strong>Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass<\/strong><strong>&nbsp;<\/strong>under&nbsp;<strong>Design of Gating System<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image is-resized\"><img decoding=\"async\" width=\"1366\" height=\"768\" src=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1176.png\" alt=\"\" class=\"wp-image-3220\" style=\"width:1140px;height:auto\" srcset=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1176.png 1366w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1176-300x169.png 300w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1176-1024x576.png 1024w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1176-768x432.png 768w\" sizes=\"(max-width: 1366px) 100vw, 1366px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The screenshot below displays the page or activity to enter your values, to get the answer for the pouring time for medium-sized and large casting up to 1000kg in mass according to the respective parameters which are the <strong>Co-efficient used to Account for Wall Thickness (S), Mass of Casting with Gates and Risers (G)<\/strong> and <strong>Thickness of the Casting (\u03b4).<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"1366\" height=\"768\" src=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1177.png\" alt=\"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System\" class=\"wp-image-3219\" srcset=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1177.png 1366w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1177-300x169.png 300w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1177-1024x576.png 1024w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1177-768x432.png 768w\" sizes=\"(max-width: 1366px) 100vw, 1366px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Now, enter the values appropriately and accordingly for the parameters as required by the <strong>Co-efficient used to Account for Wall Thickness (S)<\/strong> is <strong>9<\/strong>,<strong> Mass of Casting with Gates and Risers (G)&nbsp;<\/strong>is&nbsp;<strong>12<\/strong> and <strong>Thickness of the Casting (\u03b4)<\/strong> is <strong>21<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"1366\" height=\"768\" src=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1178.png\" alt=\"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System\" class=\"wp-image-3218\" srcset=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1178.png 1366w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1178-300x169.png 300w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1178-1024x576.png 1024w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1178-768x432.png 768w\" sizes=\"(max-width: 1366px) 100vw, 1366px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Finally, Click on Calculate<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"1366\" height=\"768\" src=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1179.png\" alt=\"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System\" class=\"wp-image-3217\" srcset=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1179.png 1366w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1179-300x169.png 300w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1179-1024x576.png 1024w, https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/Screenshot-1179-768x432.png 768w\" sizes=\"(max-width: 1366px) 100vw, 1366px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">As you can see from the screenshot above,&nbsp;<strong>Nickzom Calculator<\/strong>\u2013 The Calculator Encyclopedia solves for the pouring time for medium-sized and large casting up to 1000kg in mass and presents the formula, workings and steps too.<\/p>\n","protected":false},"excerpt":{"rendered":"The image above represents pouring time for medium-sized and large casting up to 1000kg in mass. To calculate&hellip;","protected":false},"author":5,"featured_media":13620,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","_lmt_disableupdate":"","_lmt_disable":"","_sitemap_exclude":false,"_sitemap_priority":"","_sitemap_frequency":"","_yoast_wpseo_focuskw_text_input":"","csco_display_header_overlay":false,"csco_singular_sidebar":"","csco_page_header_type":"","footnotes":""},"categories":[47],"tags":[906,870,60,871,907,543,910,909],"class_list":["post-3208","post","type-post","status-publish","format-standard","has-post-thumbnail","category-engineering","tag-co-efficient-used-to-account-for-wall-thickness","tag-design-of-gating-system","tag-engineering","tag-foundry-technology","tag-mass-of-casting-with-gates-and-risers","tag-materials-and-metallurgical","tag-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass","tag-thickness-of-the-casting","cs-entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System<\/title>\n<meta name=\"description\" content=\"Master How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass in the Design of Gating System\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System\" \/>\n<meta property=\"og:description\" content=\"Master How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass in the Design of Gating System\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/\" \/>\n<meta property=\"og:site_name\" content=\"Nickzom Academy\" \/>\n<meta property=\"article:published_time\" content=\"2020-04-21T22:13:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-03-31T06:57:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/80fc133b-f324-4fb8-ac09-954d880d77da.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Loveth Idoko\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Loveth Idoko\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/\"},\"author\":{\"name\":\"Loveth Idoko\",\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/#\\\/schema\\\/person\\\/c11f31e5522ed7e1ed0d78e7d9767042\"},\"headline\":\"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System\",\"datePublished\":\"2020-04-21T22:13:12+00:00\",\"dateModified\":\"2024-03-31T06:57:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/\"},\"wordCount\":1178,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/80fc133b-f324-4fb8-ac09-954d880d77da.jpeg\",\"keywords\":[\"co-efficient used to account for wall thickness\",\"design of gating system\",\"engineering\",\"foundry technology\",\"mass of casting with gates and risers\",\"materials and metallurgical\",\"pouring time for medium-sized and large casting up to 1000kg in mass\",\"thickness of the casting\"],\"articleSection\":[\"Engineering\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/\",\"url\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/\",\"name\":\"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/80fc133b-f324-4fb8-ac09-954d880d77da.jpeg\",\"datePublished\":\"2020-04-21T22:13:12+00:00\",\"dateModified\":\"2024-03-31T06:57:55+00:00\",\"description\":\"Master How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass in the Design of Gating System\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/80fc133b-f324-4fb8-ac09-954d880d77da.jpeg\",\"contentUrl\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/80fc133b-f324-4fb8-ac09-954d880d77da.jpeg\",\"width\":1024,\"height\":1024,\"caption\":\"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/2020\\\/04\\\/21\\\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/\",\"name\":\"Nickzom Academy\",\"description\":\"Unlock the power of learning: Dive into the world of calculations and excel in school education with Nickzom.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/#organization\",\"name\":\"Nickzom Academy\",\"url\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/icon-1024.png\",\"contentUrl\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/icon-1024.png\",\"width\":1024,\"height\":1024,\"caption\":\"Nickzom Academy\"},\"image\":{\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/#\\\/schema\\\/person\\\/c11f31e5522ed7e1ed0d78e7d9767042\",\"name\":\"Loveth Idoko\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b3148ea99bae69606b0ea410ab9e61588506bfe3590e761560389ac6cfb4b7f1?s=96&d=monsterid&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b3148ea99bae69606b0ea410ab9e61588506bfe3590e761560389ac6cfb4b7f1?s=96&d=monsterid&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b3148ea99bae69606b0ea410ab9e61588506bfe3590e761560389ac6cfb4b7f1?s=96&d=monsterid&r=g\",\"caption\":\"Loveth Idoko\"},\"sameAs\":[\"https:\\\/\\\/www.nickzom.org\"],\"url\":\"https:\\\/\\\/www.nickzom.org\\\/blog\\\/author\\\/loveth\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System","description":"Master How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass in the Design of Gating System","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/","og_locale":"en_US","og_type":"article","og_title":"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System","og_description":"Master How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass in the Design of Gating System","og_url":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/","og_site_name":"Nickzom Academy","article_published_time":"2020-04-21T22:13:12+00:00","article_modified_time":"2024-03-31T06:57:55+00:00","og_image":[{"width":1024,"height":1024,"url":"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/80fc133b-f324-4fb8-ac09-954d880d77da.jpeg","type":"image\/jpeg"}],"author":"Loveth Idoko","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Loveth Idoko","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/#article","isPartOf":{"@id":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/"},"author":{"name":"Loveth Idoko","@id":"https:\/\/www.nickzom.org\/blog\/#\/schema\/person\/c11f31e5522ed7e1ed0d78e7d9767042"},"headline":"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System","datePublished":"2020-04-21T22:13:12+00:00","dateModified":"2024-03-31T06:57:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/"},"wordCount":1178,"commentCount":0,"publisher":{"@id":"https:\/\/www.nickzom.org\/blog\/#organization"},"image":{"@id":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/#primaryimage"},"thumbnailUrl":"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/80fc133b-f324-4fb8-ac09-954d880d77da.jpeg","keywords":["co-efficient used to account for wall thickness","design of gating system","engineering","foundry technology","mass of casting with gates and risers","materials and metallurgical","pouring time for medium-sized and large casting up to 1000kg in mass","thickness of the casting"],"articleSection":["Engineering"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/","url":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/","name":"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System","isPartOf":{"@id":"https:\/\/www.nickzom.org\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/#primaryimage"},"image":{"@id":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/#primaryimage"},"thumbnailUrl":"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/80fc133b-f324-4fb8-ac09-954d880d77da.jpeg","datePublished":"2020-04-21T22:13:12+00:00","dateModified":"2024-03-31T06:57:55+00:00","description":"Master How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass in the Design of Gating System","breadcrumb":{"@id":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/#primaryimage","url":"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/80fc133b-f324-4fb8-ac09-954d880d77da.jpeg","contentUrl":"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2020\/04\/80fc133b-f324-4fb8-ac09-954d880d77da.jpeg","width":1024,"height":1024,"caption":"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nickzom.org\/blog\/2020\/04\/21\/how-to-calculate-and-solve-for-pouring-time-for-medium-sized-and-large-casting-up-to-1000kg-in-mass-design-of-gating-system\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.nickzom.org\/blog\/"},{"@type":"ListItem","position":2,"name":"How to Calculate and Solve for Pouring Time for Medium-Sized and Large Casting up to 1000kg in Mass | Design of Gating System"}]},{"@type":"WebSite","@id":"https:\/\/www.nickzom.org\/blog\/#website","url":"https:\/\/www.nickzom.org\/blog\/","name":"Nickzom Academy","description":"Unlock the power of learning: Dive into the world of calculations and excel in school education with Nickzom.","publisher":{"@id":"https:\/\/www.nickzom.org\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.nickzom.org\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.nickzom.org\/blog\/#organization","name":"Nickzom Academy","url":"https:\/\/www.nickzom.org\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.nickzom.org\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2023\/06\/icon-1024.png","contentUrl":"https:\/\/www.nickzom.org\/blog\/wp-content\/uploads\/2023\/06\/icon-1024.png","width":1024,"height":1024,"caption":"Nickzom Academy"},"image":{"@id":"https:\/\/www.nickzom.org\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.nickzom.org\/blog\/#\/schema\/person\/c11f31e5522ed7e1ed0d78e7d9767042","name":"Loveth Idoko","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b3148ea99bae69606b0ea410ab9e61588506bfe3590e761560389ac6cfb4b7f1?s=96&d=monsterid&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b3148ea99bae69606b0ea410ab9e61588506bfe3590e761560389ac6cfb4b7f1?s=96&d=monsterid&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b3148ea99bae69606b0ea410ab9e61588506bfe3590e761560389ac6cfb4b7f1?s=96&d=monsterid&r=g","caption":"Loveth Idoko"},"sameAs":["https:\/\/www.nickzom.org"],"url":"https:\/\/www.nickzom.org\/blog\/author\/loveth\/"}]}},"modified_by":"Joshua Abu","_links":{"self":[{"href":"https:\/\/www.nickzom.org\/blog\/wp-json\/wp\/v2\/posts\/3208","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nickzom.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nickzom.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nickzom.org\/blog\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nickzom.org\/blog\/wp-json\/wp\/v2\/comments?post=3208"}],"version-history":[{"count":0,"href":"https:\/\/www.nickzom.org\/blog\/wp-json\/wp\/v2\/posts\/3208\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nickzom.org\/blog\/wp-json\/wp\/v2\/media\/13620"}],"wp:attachment":[{"href":"https:\/\/www.nickzom.org\/blog\/wp-json\/wp\/v2\/media?parent=3208"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nickzom.org\/blog\/wp-json\/wp\/v2\/categories?post=3208"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nickzom.org\/blog\/wp-json\/wp\/v2\/tags?post=3208"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}